HFA has not worked with the community in the development of their plans. The stadium project has shifted significantly since it was first introduced ranging in scope from a 2,000-4,500 seat capacity. When the plan was first introduced in 2012 and Home Field Advantage was approved to commence fundraising, their goals were $7-8 million. After the introduction of the 2016 School Bond, HFA had raised only $600,000 in funds and had lowered their fundraising goals to $2 million even though construction costs have steadily increased.

The plans presented here are those that were made public.

October 2017: A 3-phase plan drawing provided by WSFCS when requested.

October 2017: Plans presented at a Public Drop-In Session

September 2016: A 4,000-seat plan from HFA

September 2012: A 3,000-seat plan from HFA

July 2012: A 4,500-seat plan from HFA

July 2012: Renderings created by SHP based upon HFA Plans

May 2012: A 4,500-seat plan from HFA